Menu
Countries
Countries
The machines have already entered the Formigal ski resort to begin construction of the new Lanuza chairlift that will modernize the Izas valley from next season. It is one of the actions planned within the investment plan of the Aramón group for this summer and which is endowed with 9 million euros . It also includes the works that are being undertaken in Cerler for its expansion into the Castanesa valley.
It is a detachable six-seater chairlift that will connect the lower part of Formigal, close to the Sarrios car park, with the Lanuza pass. An equipment that will contribute to modernize the facilities in the Izas Valley, as Aramón highlights El Heraldo
"one of the most appreciated by skiers of the winter center since natural snow is preserved with good quality until late spring"
The new lift will be the first in Spain to include the new Doppelmayer D-Line system. Users will notice a smoother and quieter ride. Maintenance is easier, and its operation more stable. It has a length of 2,541 meters and a slope of 447 meters with an average slope of 18.17%. It will have a capacity for 2,400 skiers per hour, a speed of 6 m / s. It will reach level 2237 and give access to two blue tracks.
It is the same chairlift model that the group plans to place in 2021 in Castanesa , where this summer the adaptation of the service roads that began last year for the installation of a new ski lift and the adaptation of the tracks that will depart from the pass will end. from Basibé. In this case, Aramón plans to install the first chair lift of this project next year.
Cerler is precisely one of the two resorts that Aramón keeps open this summer along with that of Panticosa. The Aneto chairlift has been launched in the Benasque mountain complex and the gondola lift in Panticosa. The lifts are open from 9.30 a.m. to 5.30 p.m. Visitors can regain strength in the Ampriu and Petrosos hospitality services, respectively.
BTT routes are one of the most attractive offers and this summer comes with news since Aramón Cerler and Puro Pirineo have created an alliance to propose a new route with the Aneto chairlift to test the new jewel of enduro. 'Rincón del Cielo by Aramón Cerler' allows fans of this modality to make a spectacular descent of at least 1,350 meters and which can even reach 1,500 meters if it extends to Castejón de Sos.
Technical data TSD 6 Lanuza
- Ski lift type: Detachable 6-seater chairlift
- Length: 2,541 m
- Starting point: 1,789.40 meters
- Arrival height: 2,237 meters
- Difference in altitude: 447.6 m
- Number of bollards: 20
- Capacity: 2400 p / h
- Speed: 6 m / s
- Opening: December 2020
- Manufacturer: Doppelmayr
- Price: 7.72 million euros
Fair but possible deadlines for the new gondola lift that should connect the village of Benasque with the ski slopes of Cerler. If all goes well, the manufacturer will be awarded this summer, and in autumn they will start working for December 2025 to be able to release it.
and be the first to receive great ski deals!